*Representational Image credit Rail Analysis India

In view of Traffic-cum-Power Block for 7 hours 10 minutes (10.40 hrs to 17.50 hrs) on 01.03.2021 for launching of Normal Height Subway (NHS) in lieu of manned level crossing (JC-4) between Anara and Bagalia and 3 hrs 55 minutes for launching of Foot Over Bridge at Chhara station in Adra-Chandil section of Adra Division, the following train services will be regulated as under :-

Cancellation of Trains

· 63598/63597 Asansol-Ranchi-Asansol MEMU Passenger will remain cancelled on 01.03.2021.

Rescheduling of Train

· 08184 Danapur-Tatanagar Special will leave Danapur at 09.11 hrs instead of 05.46 hrs on 01.03.2021.

Short Termination/Short Origination of Trains

· 02211/02212 Santragachi-Purulia-Howrah Special will be short terminated at Adra and will short originate from Adra on 01.03.2021. As a result, there will be no service between Adra-Purulia-Adra on 01.03.2021.

-----------------------------Advertisement------------------------------------Abua Awas Yojna 

must read